Gensets

Training Day

Training Day covers the operating mistakes and handover gaps that become clear after the team has used the set for a week.

How Training Day helps teams run gensets

Training Day is for site teams who need a proper handover on the generator they will operate. It deals with the operating mistakes and handover gaps that usually appear after the set has done its first week of real work.

Training Day starts with the exact set on site, not a generic generator talk. The session covers the controller screen, breaker positions, fuel checks, coolant level, battery isolator, and the way your changeover actually happens during load shedding. Johannesburg dust, Durban corrosion, and Cape Town windblown dirt all affect what operators need to watch first.

Bring the first week’s snags into the room. Teams usually arrive with questions about alarms, hard starts, after-hours refuelling, or what to record after a mains failure, so the handover is built around those points. A laminated quick-check sheet by the panel helps the next shift follow the same routine.

Operator handover after first use

By the end of Training Day, site staff should know the start and stop sequence, daily inspection points, and the checks to complete before placing the set back on standby. The aim is to reduce avoidable operator errors such as missed pre-start checks, incorrect reset steps, or running with warning lights ignored. Notes from the session can be kept with the logbook near the generator.

Use Training Day to review the controller history, confirm ATS behaviour, and match the operator routine to the site’s current setup.

  • Start, stop, and reset sequence
  • Daily checks at the canopy
  • Controller alarms explained clearly

SA operating conditions covered

Training Day is shaped by how South African sites actually run through outages. That includes scheduled load shedding, municipal supply returns, shift changes, fuel delivery timing, and the difference between a factory yard, a retail centre, and a small plant room. Existing standby sets need a different handover from a newly installed unit.

Coastal sites need extra attention on corrosion around terminals, enclosures, and battery connections. Inland sites often need tighter habits around dust on radiators, air filters, and control panels, especially where trucks and forklifts move nearby. Teams are also shown when to log running hours, when to test changeover, and when a warning should be escalated to maintenance.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

What the team should record

Use Training Day when operators, maintenance staff or site supervisors need practical handover on generator checks and changeover basics.

The handover should leave behind usable records, not just verbal instructions. Operators should know where to write running hours, fuel top-ups, warning codes, service dates, and any failed changeover event. Keeping those notes with the ATS and generator paperwork makes later fault tracing far easier.