Gensets
Trailer Gen
Trailer Gen suits plants, mines and contractors that need generator capacity moved between work areas without bringing in a fixed set. These units are selected where access roads, tow points, cable routes and temporary positioning matter as much as output. On South African sites, mobility often decides whether shutdown support and temporary supply can be placed safely near the load.

Mobile power for moving sites
Trailer Gen covers mobile generator setups for sites that need power moved to where the work is happening. It is relevant for temporary supply, shutdown support and plants where access and positioning matter as much as kVA.
Trailer mounted generators are commonly used for outage cover, remote work zones, events, construction compounds and planned maintenance windows. Placement changes with weather, ground condition, security and noise limits, whether the set is heading to Johannesburg industry, Durban port-side work or Cape Town municipal projects. Cable length, refuelling access and tow vehicle suitability should be checked before dispatch.
Get photographs of the parking position, cable entry point and nearest distribution board before the unit is moved. A simple handover sheet by the controller helps operators record hours, fuel level and alarms during the hire or shutdown period. That record is useful when several teams share the same mobile set across shifts.
What matters on handover
The handover should show rated output, connection method, earthing arrangement and the shutdown steps for that exact trailer unit. It also helps to note wheel chocks, tow hitch condition, breaker settings and where the emergency stop sits. For temporary supply, one well-documented trailer genset is easier to manage than multiple uncertain options on site.
Before adding extra loads, match Trailer Gen with the relevant Runtime entry and any Load notes linked to the same duty. ATS details need a second check where the trailer set will feed an existing changeover arrangement. Use the contact form with the current panel information if switching equipment forms part of the request.
- Towable unit matched to site access
- Parking position checked before cables land
- Control panel and service information recorded
Site conditions that change setup
A trailer generator may need access through factory yards, loading bays, plant roads or shopping centre service areas before it ever reaches the connection point. Clearance height, turning space and the surface under the jockey wheel can delay positioning if they are not checked early. Sites near OR Tambo cargo routes, industrial parks and older premises often need the delivery path confirmed against gates and security rules.
Coastal corrosion affects plugs, lugs and enclosure hardware, while inland dust loads air cleaners and radiator cores faster. During load shedding periods, many sites also need the trailer set tested around operating hours so production is not interrupted twice. A proper inspection covers load connection, ventilation, exhaust direction, fuel storage and safe cable protection across traffic routes.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Details to send for Trailer Gen
Share the required kVA, application, site address and whether the unit will stand in one position or move during the job. Include photos of the connection point, access road and any obstacle such as kerbs, ramps or soft ground. If another generator is on site, mention how the temporary unit will sit alongside it.
Keep the trailer genset record with hour meter readings, fuel top-ups and breaker or alarm events from the first day on site. Where a mobile set feeds through an ATS or temporary board, file that switching information with the service note and runtime log. It makes later review easier for maintenance staff, buyers and plant supervision.
What our Industrial Generator customers say
Verified Google reviews