Specs
Trailer Gen specs
Setup notes and briefing numbers for Trailer Gen.
Trailer dimensions and towing limits
The Trailer Gen specs page lists the practical details needed before sending a mobile set to site. Check the generator, trailer and access requirements against the plant layout before delivery and changeover.
Confirm the kVA rating, drawbar height, and all-up trailer weight before dispatching a mobile unit to site. Tight factory yards in Johannesburg, wet coastal roads near Durban, and uneven access on outlying plant roads can all affect where a trailer set can be parked and coupled. Ground bearing, turning circle, and gate width matter as much as electrical load on these jobs.
Ask for clear photos of the intended parking bay, incoming connection point, and any slope or drainage channel near the changeover area. A trailer generator often arrives outside normal plant traffic patterns, so wheel chocks, cable routing, and safe pedestrian clearance should be checked before delivery day. One missing access detail can hold up cabling even when the set itself is correctly sized.
What the spec sheet must cover
Pin down alternator output, breaker size, socket arrangement, fuel tank capacity, and expected runtime at the site load. Include the earthing method, cable lengths required to reach the tie-in point, and whether the plant uses manual or automatic changeover. Those details prevent a trailer unit from arriving with the wrong connectors or too little reach.
Match Trailer Gen specs with the site switching arrangement before expanding the hire or service scope. ATS data, connector type, and existing distribution board details should be checked against the mobile set records, then sent through the contact form. That gives the dispatch and technical teams the information needed to assess placement and hookup requirements.
- Tow rating and drawbar height
- Wheel chocks and parking gradient
- Breaker, sockets, and cable reach
Access and conditions before dispatch
Industrial sites around OR Tambo, the Durban harbour belt, and Cape Town logistics routes often have strict access windows for incoming equipment. Trailer-mounted generators may also need escorting through shared yards where forklifts, tankers, or staff transport move continuously. Record security requirements, parking restrictions, and after-hours gate procedures with the spec details.
Salt air near the coast can shorten inspection intervals for exposed connectors, trailer lights, and metal hardware. On inland plants, dust loading affects radiator cleaning schedules, air filter condition, and the frequency of visual checks around the control panel. During load shedding periods, runtime logging should align with the plant's switching routine so fuel use and service needs are recorded accurately.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information to send with enquiry
Include the required kVA, site town, access width, and whether the unit must feed through an ATS or a manual changeover panel. Add photos of the parking position, DB board area, and the route the power cables will take across the yard.
Keep the trailer generator spec sheet with the runtime log, service record, and any plant switching notes for the same unit. When support documents are requested later, that file set helps identify the exact mobile genset, connection method, and operating history used on site.