A load bank gives a diesel generator a measured electrical demand so the set can be tested under proper conditions. On industrial sites in South Africa, that matters when a standby unit spends long periods idling and only runs hard during outages or monthly checks.

Resistive testing under site load
Load Bank is for generator testing where the site needs a proper electrical load instead of a guess based on idle running. It helps South African plants prove performance, check stability and confirm that the genset carries demand as intended.
Sizing starts with the genset kVA, voltage, phase arrangement and the percentage of load you need to apply during the test. Ambient heat, dusty yards on the Highveld, and salty air near the coast all affect cooling performance, cable handling and where the bank can be positioned safely.
Before the test, record panel readings, breaker details and cable routes with clear photos. A simple sheet at the controller with target load steps, frequency limits and oil, coolant and exhaust observations helps the operator log the run properly instead of relying on memory.
Records produced during the run
A proper load bank session should leave the site with actual figures, not assumptions from no-load running. Typical checks include voltage stability, frequency response, current balance across phases and whether the engine reaches and holds operating temperature while carrying demand.
Use the load bank results alongside service records before changing generator settings or widening the maintenance scope. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.
- Measured demand instead of idle guesses
- Step loading logged at each interval
- Readings captured from panel instruments
Conditions that change test planning
Access and switching arrangements matter before any bank is connected. Factory yards with limited turning space, shopping centres with restricted delivery hours and live plants with fixed shutdown windows all affect cable runs, placement and isolation procedures.
Weather and site contamination change how the generator behaves under sustained demand. Coastal corrosion can affect terminals and enclosures, while inland dust loads radiators and air filters, so pre-test inspection should cover cooling airflow, loose connections and visible fuel or oil leaks.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Load bank information to send
Send the generator make, kVA rating, voltage, phase, and whether the test is on a base load set or a standby unit. Add the reason for testing, such as commissioning, annual verification, fault tracing or concerns about wet stacking after light running.
It also helps to note the ATS or manual changeover arrangement, available cable access and the times when the site can permit a sustained test. Keep previous service notes and runtime logs with the job file so the readings can be compared against earlier runs.