Specs
Load Bank specs
Setup notes and briefing numbers for Load Bank.
Load bank ratings and connection points
The Load Bank specs page lists the key points for controlled generator testing on site. Check the rating, connection setup and test-related requirements here before arranging a load bank with a genset installation or service plan.
Check the generator kVA, voltage, phase arrangement, and available breaker size before booking a load bank. South African sites often need allowance for long cable runs, yard space for the trailer, and dust or salt exposure that affects connectors and cooling during the test. For mines, plants, depots, and commercial buildings, the spec sheet should match the actual alternator plate and site distribution layout.
A current photo set helps identify busbar access, cable entry direction, and any restrictions around the generator canopy or plant room. Include the control panel screen, main isolator, and connection area so the test setup can be checked against what is physically on site. That reduces avoidable delays when the unit arrives for commissioning, servicing, or fault finding.
Figures needed before test day
The useful brief includes target load steps, expected duration at each stage, and whether the exercise is for acceptance, servicing, or diagnosing wet stacking. Note if the set must be tested at 25, 50, 75, and 100 percent, or if a lower ceiling applies because of site restrictions. Cable lengths, termination type, and earthing method should be listed with the generator details, not added later.
Link the load bank sheet to the matching runtime record and any existing service history before changing the test scope. If an ATS panel is part of the job, state whether the load bank is being connected on the generator side or through the changeover arrangement. Use the contact form to send the genset model, kVA rating, and connection point type.
- Load steps matched to genset rating
- Connection point photos checked first
- Test duration and cable details listed
Site conditions that change testing
Freight access at OR Tambo, depot loading rules, and plant operating windows can affect how a load bank is positioned and connected. Some older industrial premises have tight turning circles, overhead pipe racks, or limited laydown space, which must be recorded before transport is arranged. Where a generator is in regular use for load shedding support, the planned test should be separated from the standby schedule.
Coastal humidity around Durban and Cape Town can influence connector condition, while inland dust on the Highveld can clog radiator fins and reduce cooling efficiency during a sustained run. Ambient temperature, ventilation in the generator room, and the route for temporary cables all matter when setting test duration and step size. On automatic sets, confirm whether mains failure simulation is required or whether the exercise is a straight resistive load test only.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information to send with specs
Send the alternator plate details, generator model, required test percentage, and the reason for the exercise. Add photos of the breaker, lugs, and cable landing area, plus the site address and any induction or permit requirements.
Keep the ATS panel record, service notes, and runtime log with this sheet so the testing file shows one consistent set of equipment details. That makes it easier to verify what was connected, what load was applied, and which readings were taken on the day.