A grounded commissioning route for South African generator sites, written for teams who already work with plant and power.

How Commissioning fits into a normal week

The Commissioning page covers the checks that matter before a generator is handed over for site use. It is for South African plants and facilities that need the genset, changeover equipment and load conditions recorded properly before routine running starts.

Commissioning starts with the exact generator model, the incoming load list, and the way the site transfers from utility to standby supply. Altitude on the Highveld affects engine output, while Durban and Cape Town sites need closer attention to corrosion, enclosure sealing, and cable terminations. Access for rigging, exhaust routing, and refuelling also needs recording before the first supervised run.

A proper photo set before energising helps tie the paperwork to what is installed on site. Include the alternator nameplate, controller screen, breaker arrangement, ATS position, and the cable entry points in the handover file. Those images are useful later when alarms, phase rotation, or control settings need to be checked against the original condition.

Handover records after first run

At completion, the site should have recorded controller settings, protection values, and the results of the no load and on load tests. Operators also need a concise starting and stopping routine that matches the installed panel and changeover arrangement. One verified configuration on the day is worth more than a stack of generic operating pages.

Link Commissioning to the matching runtime note and a Load notes entry before any extra work is added. The ATS schedule, breaker sizes, and control wiring should be checked against the installed panel before documents leave the office.

  • Controller settings captured after site tests
  • Transfer sequence checked under mains failure
  • Photos logged with commissioning documents

Site conditions that alter commissioning

Industrial sites near OR Tambo, Durban harbour, and Cape Town depots often have tighter access windows, noise limits, and security procedures that affect test planning. Existing plant also matters because a live generator room can contain parallel equipment, old cabling, or undocumented switching changes. Commissioning should identify those conditions before the handover run starts.

Coastal installations need closer inspection of terminals, battery connections, and enclosure hardware for corrosion. Inland factories usually need extra attention on radiator cleanliness, air filtration, and dust ingress around panels and alternators. During load shedding periods, the transfer test should be timed and logged so the site knows how the set behaves under an actual mains loss.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Information to send before attendance

Send a commissioning brief with site photos, expected timing, and what has already failed or been tested. Use a subject line that says exactly what the site needs.

Send the generator make and model, controller type, ATS details, expected load, and any faults seen during previous starts. It also helps to note whether fuel is on site, whether neutral earth bonding has been checked, and whether the installation is new or replacing an older unit. That information makes it easier to prepare the test sheets and handover record for the specific site.