Project
Centurion Lab
Straightforward generator notes for Centurion lab environments, for South African teams watching load sensitivity, changeover, and stable supply.

How Centurion Lab runs in a normal week
Centurion Lab is for lab environments where load sensitivity and supply stability need more attention than a standard floor. It sets out generator planning points around changeover, critical equipment, and a steadier power arrangement on site.
Centurion Lab needs sizing around instruments, extraction, cold storage, and any UPS-backed benches that cannot ride through a rough transfer. Midrand and Centurion summer storms, dry inland dust, and tight service-yard access all change where the genset can stand and how the cable route is planned. For this kind of site, the key decision is usually not headline kVA alone, but what must stay live during an outage and what can wait.
Take a full first photo set before any generator work is discussed for the lab. Include the main board, changeover position, external plinth area, exhaust clearance, and the rooms carrying incubators, fridges, or analytical equipment. Those images help the lab team and the electrical contractor refer to the same arrangement when supply interruptions start affecting tests.
Centurion lab power pack
The handover for this site should pin down the running order, the switching sequence, and the exact loads marked as essential for lab continuity. It also helps to list refrigeration, ventilation, and sensitive bench equipment separately from general sockets and lighting. That gives maintenance staff one usable record instead of a vague set of meeting notes.
Match Centurion Lab with the correct runtime note and a separate record for sensitive loads before any scope is expanded. Check canopy clearance, ATS labelling, and delivery access at the gate before a unit is moved. Use the contact form to note any nuisance trips, voltage dips, or transfer issues seen on site.
- Essential circuits split from general supply
- Board, plinth, and exhaust photos logged
- Sensitive equipment faults recorded clearly
Centurion supply conditions to note
For a Centurion lab, the brief should mention business park access rules, after-hours testing limits, and whether backup power can be exercised while staff are working with samples. Many Gauteng lab sites sit inside shared properties where noise direction, refuelling space, and truck turning room matter as much as the generator itself. If there is an existing set, ATS, or hired temporary unit on the premises, record that from the start with the current cable arrangement.
Dry Highveld air carries fine dust into radiators, filters, and control compartments, so cleaning intervals can differ from coastal sites. Thunderstorm season also raises the need to check earthing, surge protection, and restart behaviour after abrupt utility loss. On a lab property, transfer testing should be timed around active procedures, temperature-controlled storage, and any equipment that needs an orderly shutdown.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Centurion Lab briefing points
Brief the Centurion lab with site photos, testing hours, sensitive load details, and any faults already affecting power quality or continuity. Use an accurate subject line.
For this lab site, keep the ATS serial, controller settings, and weekly test record in one file set. Add fuel receipts, alarm history, and any change made to transfer timing after equipment trips. That makes later checks easier when procurement, maintenance, or compliance staff ask how backup power was configured at Centurion Lab.