Runtime
Training First
A practical runtime route with operator training first at South African sites, written for teams who already understand backup power.

How Training First fits a normal week
The Training First runtime page is for sites that need operators ready before the next outage. We set out the generator run sequence, basic checks, and handover points so your team can manage the plant safely on site.
Training First starts with the operators, not the machine spec. We map the normal start, warm-up, load acceptance and shutdown sequence against the site layout, then cover what changes between inland dust, Durban humidity and exposed yard installations. For South African plants working around load shedding, the training note must match the set, the panel and the people on shift.
Before the first supervised run, we ask for clear photos of the control panel, breaker position, fuel level point and emergency stop. Those images are used during handover so each operator can match the written step to the actual set on site. A laminated quick-check card near the generator helps during night outages and shift changes.
Operator handover after first run
Your team gets a run order they can follow under outage conditions, plus a check sheet for pre-start, live running and close-down. We record the exact handover points between maintenance staff, production supervisors and security where needed. That keeps generator use tied to the plant routine instead of turning each outage into guesswork.
Use Training First alongside the site runtime sheet and a Load notes record before any change to the switch sequence, temporary cabling or added distribution boards. Start by checking the panel legend, emergency stop position, breaker tags and changeover markings against the generator that is actually on the slab, especially where an ATS and manual bypass both exist.
- Start and stop sequence by shift
- Control panel checks before load transfer
- Handover notes for plant operators
Site conditions that change training
A training session at a Johannesburg factory does not read the same as one at a Durban coastal site or a Cape Town depot with windblown debris around the enclosure. We account for access gates, refuelling rules, shift cover and whether the set runs with manual changeover or an ATS panel. Where a plant has existing cabling and standby power procedures, the training is built around that installed arrangement rather than a clean-sheet example.
Dust loading affects radiator inspection and air filter checks on inland sites. Salt air and moisture raise the importance of terminal inspection, enclosure condition and battery care near the coast. During load shedding periods, operators also need a tighter runtime log so the service interval reflects actual hours, not the wall calendar.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information needed before the session
Send the Training First brief with the number of operators, the shift pattern, generator model details and any recurring mistakes seen during previous outages. Include photos of the control face, breaker positions and the area around the set if access is restricted. That lets the training material match the equipment your team will touch.
After the first coached start, record the ATS panel settings and any alarm history while the sequence is still fresh. Add that sheet to the service note and runtime log so procurement and maintenance can match the training session to the installed control gear.
What our Industrial Generator customers say
Verified Google reviews