Runtime
Starter Floor
A workable runtime route for starter genset setups at South African sites, written for teams who already understand backup power.

How Starter Floor works in a live week
Starter Floor is for teams putting a genset into a basic site setup for the first time. It covers the early checks around position, load, fuel, and operating routine so the unit starts its working life on the right footing.
Begin with the genset rating, the starting load, and where the unit can physically stand. Conditions differ sharply between Highveld dust, Durban salt air, and tight delivery yards in Johannesburg or Cape Town. For a first backup installation, cable route, ventilation gap, and fuel access usually decide whether the layout will work day after day.
Take a full photo record before the first routine run, including the base, exhaust side, breaker position, fuel level, and changeover point. Those images help the site team confirm what was installed and where isolation happens when Eskom drops out. Keep a short operating card near the controller so the first standby run is handled the same way on day shift and night shift.
First-run site pack
The end result is a starter operating plan, a short check sequence, and written notes that match the actual unit on site. That matters when shift staff need one clear routine for start-up, observation, and shutdown. A basic arrangement that carries essential circuits properly is more useful than a long list of extras that never get fitted.
Link this starter setup to the matching runtime note and a load notes entry before any expansion is discussed. Check canopy dimensions, panel type, and delivery access again before collection or dispatch is arranged. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.
- Opening routine matched to site demand
- Photo record taken before first duty
- Control panel details captured in writing
Checks for South African sites
We account for OR Tambo freight timing, dispatch cut-offs, ageing factory slabs, and access limits at shopping centres and small plants. A first backup installation at a site needs different planning from a premises that has run standby power for years. If there is an existing genset, note whether it stays live, stays isolated, or is being replaced.
Sea air on coastal sites speeds up corrosion around lugs, battery terminals, and enclosure hardware. Dry inland conditions push dust through filters and onto radiators, which changes cleaning frequency and visual checks. Load shedding schedules also affect when operators can test automatic changeover and log engine hours without confusing a planned test with a utility failure.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Starter setup briefing points
Send the starter setup brief with site photos, available supply points, intended load list, and any item that is currently out of service. Include the switchboard view, the proposed genset position, and the distance between them if it is known.
Create the ATS and controller record on the same day as handover, with breaker sizes, timer settings, alarm references, and the meter reading at first acceptance. File that sheet with the service note and runtime log so procurement, maintenance, and site supervision are all looking at the same information later.
What our Industrial Generator customers say
Verified Google reviews
