Runtime
Multi Site
A practical runtime route for multi-site generator fleets at South African sites, written for teams who already understand backup power.

How Multi Site works across a real week
Multi Site is for businesses running generators across more than one branch, plant, or depot. It focuses on keeping runtime records, service intervals, and operating standards aligned from site to site.
Multi Site starts with a branch list, generator details, and the way each site uses power during outages. A cold room in Durban, a workshop in Johannesburg, and a depot outside Cape Town rarely rack up hours at the same rate. Dust, salt air, access gates, and refuelling rules all change how runtime and service planning should be recorded.
Send a photo set for every branch before anyone compares logs or service dates. Control panel labels, hour meter readings, breaker positions, and the area around the genset help separate one site from another on shared records. That usually cuts down confusion when staff at different locations report the same fault in different words.
Branch records that stay aligned
The outcome is a single way to track hours, servicing, and operating notes across more than one location. Instead of each branch keeping its own version, the fleet can be checked against one standard record set. That matters when maintenance dates, fuel use, and shutdown events need to be compared site by site.
Match Multi Site with the branch runtime history and any notes on changeover equipment before adding more locations to the list. ATS information should be checked against the panel plate and the existing labels at each branch, especially where older boards have been altered. Use the contact form to identify each branch by name or suburb.
- Branch runtime logs kept in one format
- Hour meter photos from every location
- Failure records grouped by branch
Site conditions across SA branches
A multi-site rollout in South Africa has to account for different operating patterns between plants, depots, retail branches, and municipal supply areas. One branch may run through evening load shedding every week while another only logs hours during occasional utility failures. Existing switchgear, yard access, security procedures, and fuel delivery windows should be listed per location, not assumed across the whole group.
Coastal sites often need closer attention on corrosion around terminals, canopies, and fasteners. Inland branches can see heavier dust loading on filters, radiators, and alternator air paths, especially near yards and industrial roads. Test schedules should also fit the site, because a hospital store, factory line, and remote depot do not shut down under the same conditions.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information needed from each branch
Send the Multi Site brief with photos for each branch, site timing, and a record of failures already on hand. Keep the subject line aligned to the rollout.
Record the generator model, serial number, kVA rating, controller type, and current hour reading for every site in the group. Add photos of the panel, breaker, ATS if fitted, and the genset position within the yard or plant. When faults have repeated at one branch, include dates and what tripped, overheated, failed to start, or was reset on site.
What our Industrial Generator customers say
Verified Google reviews