Runtime
Demo Path
A practical runtime route for on-site genset demonstrations at South African sites, written for teams who already understand backup power.

On-site demo run sequence
Demo Path lays out a practical route for running a genset demonstration on site. It covers how to prepare the area, check the load arrangement, and present a unit under conditions that reflect real operating use.
Begin with the duty load, cable route, and where the set will stand during the demonstration. Conditions differ sharply between inland yards and coastal plants, so dust loading, salt in the air, drainage after rain, and security access all need checking before the engine starts. For South African sites, planned outages and municipal supply instability also shape how the run should be staged.
Before any unit is started, capture the first photo set with the breaker position, cable route, fuel level, and panel screen visible. That record helps the team compare the demonstration setup with the live plant arrangement and avoids confusion later when runtime notes are checked against site conditions.
What the site team records
The demonstration should leave the site with a run sheet, switching notes, and a simple fault list from the test period. Record start temperature, load steps, voltage behaviour, and any alarm seen on the controller rather than relying on memory after shift change. One tested arrangement under plant conditions is more useful than several unproven options discussed around a table.
Start the Demo Path by marking the set position, exhaust direction, and cable run to the test board before the first crank. On inland sites around Gauteng, pay attention to dust, loose gravel, and long cable pulls, while coastal plants near Durban or Gqeberha need extra checks for salt residue, windblown spray, and wet ground after rain. Use the contact form to send the panel designation, site town, and the intended standing area so the run sequence can match the actual plant layout.
- Run order suited to the plant
- Pre-start photos logged before cables move
- Faults listed from the demonstration run
Site conditions that affect the demo
Plan around OR Tambo cargo timing, gate bookings, escort rules, and the operating hours of the receiving site. Older factories often have tight turning circles, uneven yards, and switchrooms with limited working space, which changes how the unit is positioned and connected. If a standby set is still in service, note that early so the demonstration does not clash with production cover requirements.
Coastal installations need attention to corrosion points on terminals, enclosures, and exposed hardware during the route. Inland plants usually demand closer checks on air filtration, radiator cleanliness, and dust build-up around control gear. Where load shedding remains part of daily planning, test windows and runtime logging must line up with the site's outage schedule and transfer procedure.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Paperwork carried with the run
Brief Demo Path with site photos, operating hours, and the faults already seen. Keep the subject line direct.
Before the buyer asks for backup documents, save the ATS panel record from the demonstration day with the controller screenshots and hour reading. Add that sheet to the service note and runtime log so the site file shows what was tested, what transferred correctly, and which checks still need attention.