Resources
Warranty Note
A warranty note for South African generator buyers, setting out the records, service items, and operating conditions that matter.
How Warranty Note is used after a site fault
Warranty Note explains the records, service items, and operating conditions that affect generator cover. It is written for South African buyers who need to keep paperwork and maintenance in order while the unit is in use.
Record the generator model, serial number, site name, and the hour meter reading before any claim is discussed. Inland dust, coastal corrosion, poor fuel storage, and frequent load shedding all affect what must be logged in a warranty file. This note is aimed at South African plants, depots, workshops, and commercial sites where evidence matters after a shutdown or fault.
Begin with clear photos taken at the unit, not from old handover files. Include the control panel screen, breaker position, fault code, leaking points, and any visible wiring damage. Those records help separate operating issues from component failure when the unit has been running under site load.
Records that support cover
A proper Warranty Note sets out the event time, operating hours, recent service work, and the condition of key consumables. It should also state whether the genset was on mains failure, manual test, or maintenance run when the problem started. One accurate page with dates and images is more useful than a long chain of vague messages.
Link the failure note to the matching service history and any previous runtime entries before more parts are ordered. Check the ATS information, alternator details, and controller alarms against site records first.
- Hour meter reading at fault time
- Photos of alarms, leaks, and damage
- Service dates and parts fitted
Conditions that affect claims
South African operating conditions matter when a warranty query is reviewed. Cape Town salt air, Highveld dust, long idle periods, and repeated Eskom outages can all change filter condition, battery health, and cooling performance. If the site has old changeover gear, mixed cabling, or non-standard fuel storage, note that in the file from the start.
Missed services, contaminated diesel, low coolant, and overloaded circuits are common reasons a case becomes difficult to assess. Keep test logs, delivery slips for filters and oil, and technician worksheets with the note. On sites with regular outage cycles, record each run and any abnormal smoke, heat, or shutdown warning shown during operation.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
What to include on day one
Draft the Warranty Note with site photos, fault timing, and the parts or systems already failed. Keep the subject line exact so the generator and site are easy to identify.
Write the fault date, exact site location, unit identification, and the names of people present when the failure occurred. Add photos of the installation, the failed part or system, and any external damage nearby. When the buyer asks for supporting records, pair the Warranty Note with the maintenance log and the latest service report.