Resources
Spec Card
A straight spec card for South African generator buyers, built for sites that already work with load and runtime requirements.
How Spec Card helps with generator matching
Spec Card gives generator buyers a clean summary of the figures that matter on site. It is built for South African plants comparing load, runtime, and sizing requirements before choosing a genset.
A useful Spec Card starts with the figures that decide fit on site: required kVA, starting current, duty cycle, and the space available for the set. Conditions in Gauteng, the coast, and remote plant yards change what must be noted, from dust loading on filters to corrosion risk around terminals. For South African buyers, one page with the right numbers is more useful than a long file missing the basics.
Include clear photos of the existing generator, nameplate, breaker, and changeover gear when you complete the Spec Card. Those images help identify cable entry, canopy clearance, and panel arrangement before anyone compares options. If the current unit has nuisance trips, smoke, hard starting, or high fuel use, note that on the form as part of the site record.
Key figures on one sheet
The finished Spec Card should read like a site summary, not a marketing document. It captures the load requirement, runtime expectation, voltage details, and any installation limits that affect generator selection. That gives procurement, maintenance, and operations one reference point when they review a genset for the plant.
Before sending the form, check that the ATS rating, existing generator model, and required standby duration are written exactly as shown on site labels and records. Add photos of the control panel and cable connections if there is any doubt about switching equipment. If you send it through the contact form, include the site name and the main load or kVA requirement in the message.
- Rated load, starting load, and standby hours
- Photos of panel, nameplate, and access route
- Space for faults seen on current unit
SA site details worth recording
A plant in Ekurhuleni, a coastal depot near Durban, and a factory outside Cape Town do not present the same operating conditions. The Spec Card should note ambient heat, dust exposure, salt air, fuel storage arrangement, and whether the unit runs as standby or for longer scheduled outages. Delivery access also matters when there are narrow gates, shared yards, or crane restrictions.
Electrical checks should cover phase requirement, frequency, breaker size, earthing point, and the type of changeover in use. Mechanical notes should mention radiator airflow, exhaust routing, plinth condition, and service access around the canopy or open set. Where load shedding forms part of normal operation, the card must reflect expected run hours and test intervals.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
What to capture on Spec Card
Fill out the Spec Card with site photos, required timing, and any performance issues already seen on the existing unit. Use an honest subject line with the site or load requirement.
Use the sheet to record the site contact, installation town, generator duty, and any deadline linked to shutdowns or tenant operations. Attach supporting photos and list recurring issues such as low oil pressure alarms, coolant leaks, or weak battery charging. When kept with the runtime log and service history, the Spec Card gives a cleaner basis for comparing replacement or upgrade options.