A working power guide for South African sites, covering load, starting demand, runtime, and generator sizing.
How Power Guide helps with load and runtime planning
Power Guide sets out the basics that matter before you size a genset for a South African site. It covers running load, motor starting demand, expected runtime, and the generator capacity needed to carry the job without guesswork.
Power Guide starts with the figures that usually get missed on South African sites. Record the running kW, the biggest motor start, fuel autonomy required, and any restrictions on access, noise, or exhaust routing. Conditions differ sharply between inland dust, coastal corrosion, and dense urban compounds, so the guide works from actual operating environments.
Begin by capturing the existing installation before any sizing discussion moves ahead. Clear photos of the main board, changeover gear, cable entry, nameplates, and generator position help prevent wrong assumptions about breaker size, phase configuration, and ventilation. Keep those images with the job file so the next person reviewing the site sees the same constraints.
Sizing points that change outcomes
Power Guide sets out how to separate essential load from non-critical demand, how to note motor starting current, and when runtime expectations push you toward a larger fuel arrangement. That gives plant teams a written basis for discussing a genset, panel changes, or operating limits without vague estimates.
Use Power Guide alongside site records for switching gear, fuel storage, and maintenance history before any scope is expanded. Check whether the enclosure, base tank, and cable route shown on site can actually support the intended duty cycle. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.
- Running load captured by circuit or machine
- Motor starting demand noted before sizing
- Photos, ratings, and outage pattern logged
Site conditions that alter sizing
Power Guide takes account of the patterns South African facilities deal with during Eskom interruptions and planned shutdowns. A factory in Johannesburg may have limited truck access and dust-heavy yards, while a Durban site may need extra attention on corrosion, enclosure seals, and radiator cleanliness. Existing ATS equipment, old cabling, and mixed new-to-old plant often matter as much as the generator rating itself.
Runtime planning changes when the outage window is uncertain or when a site must carry refrigeration, pumps, compressors, or security systems for extended periods. Ventilation openings, refuelling access, and night-time noise restrictions should be checked before a set is placed or resized. For that reason, the guide keeps attention on load, switching, and operating conditions instead of generic product language.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Records to keep with the file
Use the Power Guide to capture site photos, outage schedules, and the equipment or generator issues already reported. Keep the subject line factual and site-specific.
Save the completed guide with panel photos, breaker details, load lists, and any notes on tripping, hard starts, or unstable voltage. Those records are useful when maintenance teams compare runtime logs, review service intervals, or revisit a sizing decision after equipment is added. A complete file also helps when different people on the site need to refer to the same installation history.