Photo Protocol
A photo protocol for South African generator sites, showing what to capture for access, cabling, switchgear, and installation position.
How Photo Protocol keeps site records useful
The Photo Protocol page sets out exactly what to capture on a generator site. Include access, cabling, switchgear and the intended installation position so the technical picture is complete before the genset is moved.
Begin the photo record with the genset rating plate, the point of connection, and the route a crane or forklift would need. Dust on inland sites, salt air near the coast, and tight yard access each change what must be visible in the images. Photo Protocol is written for South African industrial properties where switchgear layout and delivery space matter as much as the machine itself.
Take the first image set before anything is moved, cleaned, or disconnected. A useful record shows the existing position, cable entry, panel labels, and any obstruction around the installation area. That gives the technical team a true view of the site instead of a rushed phone picture after an outage.
Images that answer install questions
Include wide shots for access and close shots for nameplates, breakers, cable glands, and changeover equipment. One complete record is more useful than a folder of random angles with no scale or location.
Link the Photo Protocol record to the matching runtime note and any load note before the job scope changes. Check the ATS panel photos twice so terminal markings, door labels, and feeder routes can be read clearly. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.
- Access route shown from gate to pad
- Panel labels captured before any shutdown
- Existing faults listed with matching photos
Site conditions worth photographing
Show turning space for delivery vehicles, gate widths, gradients, and the final set-down point. Warehouses, plants, and retail back-of-house areas often have bollards, ramps, trench covers, or low canopies that affect placement. A clear image of each restriction saves guesswork when the genset is scheduled for movement.
Coastal corrosion should be visible on doors, latches, terminals, and canopy edges where possible. On inland sites, photograph dust build-up around radiators, alternator vents, and control cabinets if it affects service planning. During load shedding periods, include the changeover position and any display screens that show alarms, hours, or failed starts.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
ATS and cabling photo order
Follow the Photo Protocol with clear site photos, outage timing, and a record of what has already failed on the generator setup. Name the subject line after the actual site.
Capture the ATS panel in a fixed order: full front view, door labels, internal components, incomer and outgoing cables, then any nearby distribution board. Add photos of gland plates, earthing points, and cable support so the installation file reflects the actual site condition. When these images are stored with the service note and runtime log, later checks are easier to match to the correct equipment.