A media guide for South African generator jobs, setting out what photos and video help with quoting, access, and fault review.
How Media Guide supports generator project updates
The Media Guide page explains what photos and video help most on a generator job. Show access, cable routes, switchgear, installation position and any tight site conditions so quoting and fault review are based on the actual layout.
For the Media Guide, begin with wide shots of the generator area and the route into site. Include the nameplate if it is visible, then capture cable entry, exhaust direction, fuel storage and any obstructions that will affect lifting or service access. South African sites differ sharply between inland dust exposure and coastal corrosion, so the photo set should show the actual operating environment.
A useful image pack shows more than the machine itself. Photograph the changeover panel, distribution board labels, gate width, parking area for delivery vehicles and the final installation position. If there is a fault under review, add close images of alarms, leaks, damaged parts or tripped breakers before anything is reset.
Photos that help quoting
The best submissions combine overview images with a few tight detail shots. Record stairways, narrow passages, crane access points and the clearance around doors or canopies so transport and placement can be judged against the actual site. A short video walk-through is useful where the cable route turns through multiple rooms or plant areas.
When you send material through the contact form, group files by project or location and keep dates visible where possible. Add one image of the existing ATS or main changeover equipment, one image of the intended generator position and one image showing access from the road or yard. If any failed part has been identified, include a close shot of the damaged item and its rating plate.
- Gate, yard and offloading access
- Switchgear labels and breaker positions
- Fault images before resets or repairs
SA site details to capture
On many local factory and depot sites, access is affected by security checks, loading bays and shared vehicle routes. Show the entrance, guard point, turning circle and any height limits that could stop a truck, crane or forklift from reaching the generator area. These details matter as much as the machine size when planning delivery or removal.
Coastal installations should include photos of rusted fittings, louvre condition and canopy hardware where salt air is present. Highveld and mining-adjacent sites should show dust build-up around radiators, panels and air intakes. During load shedding periods, it also helps to note whether images were taken while the site was on utility supply or on generator power.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
What to send with images
Use the Media Guide to gather site photos, key dates, and any failed parts or systems already identified. Keep the subject line tied to the project or location.
Alongside the media, add the site name, town, contact on site and the dates when access is possible. Mention whether the work relates to a new install, service visit, relocation, fault finding or removal. If permits, shutdown windows or shopping-centre trading restrictions apply, note those with the file set so the job can be reviewed against site conditions.