A practical install checklist for South African generator sites, covering placement, changeover, cabling, and commissioning basics.

How Install Checklist helps on an installation week

The Install Checklist page covers the main points to confirm before a generator goes into position. Placement, changeover setup, cabling and commissioning basics should all be checked before the site depends on the unit during load shedding.

Begin with the planned generator position, crane or forklift access, and the changeover point. Sites in Gauteng often need dust control around radiator airflow, while Durban and Cape Town installations need attention to salt exposure on terminals, panels, and fasteners. Confirm earthing, exhaust direction, and delivery clearance before the unit leaves the yard.

Take a full photo record before offloading starts. Include the plinth or slab, cable entry route, main board, ATS location, and any tight turning areas for the truck. Those images help the installer check gland sizes, trench readiness, and whether the canopy doors will open properly once the set is in place.

Checks before the generator lands

Tick off the items that should be completed before commissioning starts. Record the generator model, breaker rating, cable lengths, and the exact panel the set will feed. It is better to catch a missing neutral link or undersized cable lug before first start than during an outage.

Use this checklist with the site photos, delivery timing, and commissioning notes so the install file stays complete. Note whether the job needs trenching, a bunded fuel tank, rain cover for the changeover area, or after-hours placement at the premises.

  • Generator position marked and measured
  • ATS and main board identified
  • Photos attached for site checking

Installation points for South African sites

Check vehicle access, security gate width, and offloading space before delivery day. Many factory and warehouse sites have tight yards, shared loading zones, or restricted access hours that affect crane placement and final positioning. If the generator must pass under sprinklers, awnings, or overhead trays, measure that route in advance.

Weather and power conditions change what must be inspected. Inland sites may need extra attention on dust ingress at the alternator and control cubicle, while coastal locations should inspect corrosion risk on battery terminals, busbars, and exposed hardware. Where load shedding is frequent, test auto start, return delay, and mains sensing only after the cabling and earthing have been signed off.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Commissioning records to capture

Complete the Install Checklist with site images, delivery or fitment timing, and faults picked up before commissioning. Write the subject line for the exact generator job.

Log the first start date, hour meter reading, coolant level check, battery voltage, and any alarms shown on the controller. Add photos of the nameplate, breaker settings, ATS, exhaust outlet, and finished cable termination. Keep that record with the install checklist so later service work matches the exact site setup.