Press
Partner Note
A practical note on partner work across South African generator projects, written for teams coordinating installs, maintenance, and backup power support.
How Partner work lands in a normal week
The Partner Note page sets out how shared generator work should be handled across installs, maintenance and standby support. Use it where site teams, outside contractors and service crews all need the same job picture.
Partner work on a generator site starts with roles, not assumptions. Note who controls access, who isolates the set, and who signs off on fuel, cabling, and changeover checks. A factory in Gauteng may need after-hours gate clearance, while a coastal site may need extra attention on corrosion around terminals and enclosures.
Send the first photo set before people arrive on site. Include the genset nameplate, ATS position, cable entry, and the space around the breaker or panel board. That gives installers, maintenance crews, and outside contractors one shared view of what is standing there now.
Shared handover points
This note is used to pin down who brings what, who tests what, and what stays with the site file afterwards. Record the generator model, switchgear involved, permit requirements, and the handover time expected by the plant team. Clear written allocation matters when service crews and subcontractors touch the same standby system.
Link this Partner Note to the relevant runtime record and any prior load note before extra work is added. Check canopy dimensions, lifting arrangements, and ATS references again before parts move between depots or to site. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.
- Named roles for site handover
- Photos of ATS and access points
- Contact kept in one job thread
SA site factors to record
A partner brief should mention depot rules, mine induction requirements, shopping centre access windows, and municipal noise limits where they apply. Sites near OR Tambo may work around freight collection timing, while remote plants may need fuel delivery details written in from the start. Put the breakdown call and the planned maintenance scope in separate notes so neither gets buried.
Conditions differ sharply between inland and coastal work. Salt air can affect terminals, battery trays, and canopy fittings, while dust on Highveld sites can shorten filter and radiator cleaning intervals. During load shedding periods, log the last test date and the actual runtime pattern so partner crews know whether they are walking into routine service or repeated emergency use.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Partner brief contents
Share the partner brief with site photos, handover timing, scope of supply, and any generator or changeover issues already picked up. Keep the subject line specific.
Capture the ATS reference, panel labels, key contacts, and lockout arrangement on the day the note is opened. Add delivery limits, crane or forklift needs, and any issue the previous crew found with starting, alarms, or changeover. Keep the note with the service record and runtime log when documents are requested later.