Load notes
Training Card

Training Card gives each operator the same steps at the genset, from pre-start checks to shutdown logging. It is meant for shift teams who must note alarms, fuel level, breaker position and any issue that needs escalation to maintenance.
Generator knowledge should not sit with one person on one shift. On South African facilities, operators need a clear card for start-up, shutdown, alarm checks, fuel notes, and when to escalate. Training Card turns routine genset handling into something the whole team can follow.
Keep a card next to the control panel for the exact checks on that unit, not a long procedure file in an office. On sites in Gauteng, KwaZulu-Natal and the Western Cape, the card should also show where to report faults through the contact form when the shift log is not enough.
Details that belong on the card
- Generator ID and shift noted
- Panel alarm codes written exactly as shown
- Start, stop and breaker steps listed
- Supervisor name and handover role recorded
The card should match the actual set on site, not a generic training sheet copied between plants. Keep it aligned with the generator model, the control panel layout and the reporting route used by your maintenance team.
Shift use during outages
The Training Card page gives operators a short record of what must happen at the generator. Use it for shutdown steps, daily checks and fault reporting so the basics stay consistent across shifts.
During load shedding or a utility fault, operators need a short sequence they can follow without hunting through manuals. A proper card covers visual checks, start confirmation, warm-up observations, abnormal noise, leaks, battery condition and the point where someone must stop and escalate.
Place one copy at the genset and another in the shift file if your site uses paper records. On dusty inland plants and coastal premises with corrosion around enclosures, a laminated card lasts longer and stays readable after routine wipe-downs.
What the operator keeps
The useful version is brief enough to read beside a running machine and specific enough to prevent missed checks. It should leave the team with a fixed routine for shutdown, refuelling notes, fault wording and handover remarks between day and night shift.
Before changing the wording, check the card against the runtime log and the unit's service record so the sequence still matches the site setup. If a panel label is missing or unreadable, tell us through the contact form which step on the card needs correction.
- Clear action order at shutdown
- Alarm check signed by operator
- Escalation contact listed on card
Conditions that change the wording
A training card for a factory in Johannesburg may not suit a coastal installation near Durban where rust, damp and enclosure condition need closer watch. Sites with older ATS equipment, remote tanks or separate day tanks also need card steps that reflect the real switching and fuel-check sequence.
South African operating conditions matter when you decide what goes on the card. Dust affects air intake checks, frequent outages increase runtime entries, and long holiday shutdowns can change battery and fuel inspection routines before the next start.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Training card content points
Training Card gives each operator the same steps at the genset, from pre-start checks to shutdown logging. It is meant for shift teams who must note alarms, fuel level, breaker position and any issue that needs escalation to maintenance.
When filing records, keep the Training Card with the runtime sheet and service notes for the same set. That gives supervisors one place to verify who started the machine, what was observed during the run and whether any fault was carried over to the next shift.