Load notes

Power Windows

Record the actual power window for each site, including load shedding slots, start-up demand and required runtime on fuel.

Every site has a short window to test backup power without disrupting production. In South Africa that usually means matching generator run times to load shedding slots, tenant hours, or plant shift changes. Power Windows looks at the best moments for testing, changeover checks, and planned runs.

Power Windows records when a site can actually carry a generator run without upsetting production. Note the Eskom outage slot, the shift handover time, and the minimum fuel runtime needed after startup.

Times that matter on site

  • Load shedding slot written exactly
  • Startup load noted from actual equipment
  • Runtime on fuel matched to shift
  • Site contact and operating hours listed

Power Windows sits between the load note and the generator run plan. It is where the site records when transfer can happen, how long the set must hold, and which period is safe for testing. That matters more than a generic timetable when production lines, tenants, or cold rooms are involved.

Test windows during load shedding

The Power Windows page is for recording when the site actually needs generator support. Note each load shedding slot, startup demand and the runtime required on fuel so the genset and tank plan match the working day.

A Johannesburg factory may only allow a run during tea break or shift change, while a Durban premises may prefer the known Eskom slot after opening checks are done. Cape Town sites often need the window tied to tenant access, security procedures, or trading hours. The note should reflect the real operating day, not the ideal one.

Write down what happens in the first ten minutes after changeover. Some sites see a brief surge from compressors, pumps, extraction fans, or chillers before the load settles. That startup demand affects both generator sizing and the fuel runtime you record for the window.

What the window note must show

The finished note should state the preferred run period, the backup period that still works, and the load that comes on first. Include whether the genset is needed only for essential circuits or for a wider plant load. That gives operations staff a usable record for planned tests and actual outages.

Link the note to the runtime note and the switching details before filing it away. If the ATS sequence or manual changeover procedure still needs checking, mention that clearly when you use the contact form. One current panel photo and the stated run window are more useful than a long message.

  • Run period tied to site reality
  • Startup sequence checked before test run
  • Named site contact for handover

South African operating pressures

Power Windows in South Africa often follows Eskom schedules, landlord rules, and plant shift patterns rather than a neat maintenance calendar. A warehouse in Gauteng, a food site in KZN, and a mixed-use building in the Western Cape can each need a different test hour. Record the standing weekly plan separately from any breakdown event.

Coastal humidity can change how often a site wants planned runs and inspections, while inland dust may affect filter condition during longer operating periods. The note should also show if refuelling access, noise limits, or security access restrict the time available. Those site conditions decide whether a two-hour slot is enough or whether a longer runtime must be planned.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Entries to capture

Record the actual power window for each site, including load shedding slots, start-up demand and required runtime on fuel.

Log the exact support period the site expects from the genset. Add the Eskom stage slot, the startup demand, and the required runtime on fuel in one record. When service documents are checked later, the note helps explain why that operating window was chosen.