Load notes

Photo Angles

A practical field note on site photos so access points, changeover panels and generator positions are easy to confirm.

A clear photo can settle a generator query before the wrong part is sent. On South African sites that means getting the alternator plate, controller screen, breaker position, and cable entry in frame. Photo Angles explains which views help with fault finding and service planning.

Photo sets for generator assessments need more than a single wide shot. Show the approach road, the changeover point, the genset nameplate and the space where lifting or cabling must happen, so the site can be read properly from the images. Our contact form takes attachments, so attach the clearest views.

Angles that answer site questions

  • Main access gate photographed open
  • Panel labels copied out in full
  • Site contact named with role and number

Use this note together with the relevant generator and service pages when a site has more than one power source or a difficult cable route. The image set shows physical conditions that specs alone do not capture, especially around panel position, standing space and delivery access.

Views that matter on site

The Photo Angles page shows which site photos help us assess a genset position properly. Include access points, the changeover panel, cable route and the proposed generator standing area so layout problems are visible before delivery or installation.

Begin outside and work inward. On South African industrial sites, a photo of the truck approach, gate width and yard turning area often settles whether a canopy set can be offloaded where the client wants it. After that, move to the panel, existing generator position and cable entry points.

Take the first set in good light and keep the phone level so distances are easier to judge. Include a person, pallet or doorway in at least one frame to give scale, because plant rooms and yards can look larger on camera than they really are.

Useful shots before delivery planning

A proper image pack helps separate access problems from electrical ones. You can usually see whether the issue is breaker location, cable run obstruction, ventilation risk, or simply not enough room for the proposed generator to stand and be serviced.

Before a unit, panel component or service part is booked, link the note to the matching runtime and load note so the photos sit in the right operating context. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.

  • Standing area shown from two sides
  • Breaker position captured before any test
  • Contact details next to the photo set

SA conditions visible in photos

Show the details that change installation planning in Johannesburg, Durban or Cape Town. Yard slope, kerb height, coastal corrosion, dust build-up, roof overhangs and narrow service passages all affect where a genset can stand and how technicians reach filters, breakers and cable boxes.

Industrial sites often have added steelwork, later-built walls or containers that do not appear on older drawings. Current photos help identify blocked louvre space, exhaust discharge risks, or an ATS tucked into a room that needs a separate access route during load shedding periods.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Photo order for field teams

A practical field note on site photos so access points, changeover panels and generator positions are easy to confirm.

Work in a fixed sequence so nothing important is missed. Start with the approach and delivery path, then the proposed generator location, then the changeover panel, then close shots of the controller screen, alternator plate, breaker and cable entry, and finish with any obstacle that could affect lifting or maintenance.