First written site note
The first written site note records the generator position, cable route and changeover point so the crew arrives prepared.

What the first note must say
The first written note usually answers more than a long message does. Describe where the set stands, which way the cable route runs from set to panel, and where the changeover point sits.
- Generator position and how it is approached
- Cable route from set to panel
- Changeover point and board rating
- Site contact name and access role
Writing the note on site
Start with location, not equipment branding. Say whether the set stands outside a plant room, beside a yard wall, near a loading bay or next to an existing panel, and give the nameplate kVA.
Write the note before pallets, trucks or temporary stock block the area, and describe the route a technician would actually use when carrying leads or tools.
Records created from the first note
The note becomes the first line of the site record. Later checks, service entries and changeover tests can all point back to it, which keeps the plant, the set and the panel under one name.
Send it through the contact form, and link it to the matching runtime record when one exists.
What our Industrial Generator customers say
Verified Google reviews
Also worth a look




Tell us about your site load
Send a note through our contact form with your site, the load you need to carry, the supply and any genset you already have, and we will come back with practical options and a quote.
Open the contact form
