The first build, first install or first site setup needs more care than a repeat order. First Article is our note on checking the initial generator specification, layout and accessories before the rest follows.

First Article on a genset job is the record of the first complete site start, load test and handover, not a marketing note. We capture the readings, settings and observations that matter on plants in Gauteng, KwaZulu-Natal and the Western Cape, including controller values, breaker position and changeover behaviour.

First start-up record points

  • Plant name and test date logged
  • Controller, panel and cable photos saved
  • Correct genset model noted clearly
  • Site contact and duty named

Record the first documented start and the checks around it. The matching product record should identify the genset set, canopy, base tank or ATS hardware fitted on site. Used together, the records show what was installed, how it was tested and what still needs sign-off.

How First Article is checked on a plant genset job this week

First Article focuses on recording the first proper start-up of a generator on site. It is useful for teams that want the handover, load test and commissioning details noted correctly from day one.

Begin with the kVA rating, intended load and the actual plant arrangement. Dust on inland sites, salt air near the coast, cable route limits and municipal outage patterns all affect how the first test is planned. The note suits Johannesburg, Durban, Cape Town and smaller industrial yards where commissioning details must be written down properly.

The first photo pack should show the unit position, exhaust route, control panel and changeover gear before handover. Include meter readings and any alarm history visible on the controller at that stage. Those images help later when the site compares the original setup with a service visit or warranty question.

Records issued after handover

A proper First Article pack usually leaves the site with operating readings, a load test note and a list of open items. It should identify the generator, panel and accessories in plain terms, with enough detail for maintenance staff and the buyer to follow the same record. One verified commissioning file is more useful than several vague messages passed around after the test.

Link First Article with the runtime log and the wider Load notes record before extra units are added to the job. ATS panel data should be checked against the installed breaker and controller settings while the first file is still being compiled. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size.

  • Runtime note matched to first test
  • Initial readings captured before load step
  • Contact details kept with commissioning file

Checks shaped by SA conditions

Site access often depends on freight timing, factory shutdown slots and the way each plant handles contractors at the gate. A first installation needs different notes from an added unit at a site with an existing generator. Where a live genset is already carrying standby duty, the record should separate normal commissioning work from breakdown events and routine weekly testing.

Coastal conditions can affect terminals, enclosures and service intervals from the first months of operation. Inland dust alters filter condition, radiator cleaning frequency and the state of panel vents during testing. Load shedding also changes when transfer tests and runtime entries are taken, so the note must show whether the run was planned or triggered by an outage.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

First Article file contents

A practical commissioning note for teams who want the first generator start-up, handover and load test recorded properly.

The strongest First Article notes include controller screenshots or written settings, ATS identification, meter readings and signatures from the handover stage. Keep that file with the service paperwork and runtime sheets so later queries can be checked against the original commissioning information. It gives the buyer and maintenance team one reference point for the first installed configuration.