Load notes

Demo Day

Demo Day is the on-site run-through before a plant depends on the set during load shedding or a utility fault. Teams check the changeover sequence, cable route, laydown area and access gate while the site is still operating normally. That makes it easier to spot a locked panel, a tight turning circle or a missing earth point before the first live event.

A generator demo only helps if the right loads, cables and switching points are ready on site. Demo Day is our note on preparing for a practical genset viewing, test run or handover at an SA plant.

For Demo Day, send the panel name, expected load blocks and where the generator will stand during the test. Include the switchboard location, any permit-to-work rules and whether forklifts or tankers share the same yard access.

Pre-run checks at Sunnyrock

  • Site contact and shift confirmed
  • Photos of panel, yard and cable entry
  • Correct genset or service page linked
  • Responsible person and role stated

Read the matching generator and service pages after this note so the test day scope stays tied to the right unit. Demo Day deals with the site arrangement, not only the machine itself. That distinction matters when the genset is ready but the panel room, cable trench or security access is not.

How Demo Day plays out with an industrial genset at Sunnyrock

Demo Day is a pre-outage check for sites that want to test the generator setup before it is needed in earnest. It covers changeover, cabling routes and site access so the first power cut is not the first trial run.

Start with the actual demand on site, then split it into essential and non-essential circuits for the run. A factory in Johannesburg may need dust control around vents and radiators, while a Durban site must think harder about salt air around terminals and exposed metalwork. Access for rigging, tanker refuelling and cable protection all need checking before the generator arrives.

Take a proper photo set before anyone starts moving cables or opening covers. Capture the ATS, the mains incomer, the generator connection point and the route through doors or around production lines. Those images help the handover pack reflect the real layout instead of a rough memory from test day.

Records handed over after the run

The site should finish Demo Day with a marked operating sequence, clear switching points and notes on any restrictions found during the test. Cable lengths, breaker positions and access instructions need to be written down while the details are still fresh. One accurate run sheet is worth more than a long meeting note with no panel references.

Link Demo Day with the runtime note before changing fuel plans or operating hours. If the canopy set uses a temporary connection, check the collection or delivery arrangement only after the panel details and site photos are complete.

  • Run order matched to plant loads
  • Switching points photographed before testing
  • See Gensets, Runtime and Load notes before the Sunnyrock test run
  • Written notes for the site file

SA site factors on test day

Demo Day planning in Gauteng often includes yard congestion, shared industrial parks and dispatch timing around Sunnyrock. At coastal plants, corrosion on lugs, gland plates and exposed steel can affect what looks serviceable at first glance. If a site has existing changeover gear, an older generator plinth or fixed cable trays, those details must be flagged before the demonstration starts.

Load shedding changes how often plants rely on standby equipment, so trial runs cannot be treated as a formality. Inland dust can block cooling packs and dirty control cabinets, while humid coastal conditions may show up first at connections and sensors. The visit is there to inspect switching, access, load grouping and operating constraints under South African site conditions.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

What to prepare for Demo Day

Demo Day is the on-site run-through before a plant depends on the set during load shedding or a utility fault. Teams check the changeover sequence, cable route, laydown area and access gate while the site is still operating normally. That makes it easier to spot a locked panel, a tight turning circle or a missing earth point before the first live event.

File the ATS panel notes on the same day as the demonstration so breaker labels, cable tags and operating positions are recorded exactly as seen. Add the sheet to the service note and the runtime log if the plant keeps a maintenance file for outage readiness. That gives operations staff one place to check the sequence before the next utility interruption.