Gensets
Diesel Bay
A diesel bay needs more than a tank beside the set. Bunding, pipe routing, fill point access and spill control decide whether refuelling stays orderly on a South African plant.

Diesel storage beside the genset
Diesel Bay deals with the part of a generator installation where fuel handling, storage and daily access can either stay tidy or become a problem. South African sites often need a workable diesel area around the genset, not just a tank dropped next to it.
Tank size must match expected runtime, delivery intervals and the space around the generator. On inland sites, dust settles on caps, vents and transfer gear, while coastal air pushes corrosion on steelwork, fasteners and exposed pipework. Access for the bowser matters just as much as the tank itself in Johannesburg, Durban, Cape Town and smaller industrial yards.
Take clear photos of the fill point, drain point, bund and pipe entry before any changes are made. Those images help when checking hose lengths, lockable caps, traffic movement and whether daily operators can reach shut-off valves without climbing over equipment.
What the diesel area must include
The layout should show where fuel arrives, where it is stored and how it reaches the genset day tank or base tank. Include bund capacity, vent position, fire extinguisher placement and a straightforward route for inspections, dip checks and housekeeping.
Before changing a Diesel Bay, compare the planned tank capacity with the runtime record and the site load profile so refuelling frequency suits the plant. Keep ATS paperwork separate from fuel drawings, because cable routing, changeover settings and diesel handling need different checks. Use the contact form to say where the bund and fill point sit relative to the genset.
- Bunded tank position with service access
- Fill point, vent and drain clearly reached
- Tank and pipework details by email
Site conditions that affect fuel areas
Delivery vehicles need turning space, stable ground and a safe hose run to the fill point. Busy factories, depots and retail service yards often have tight movement windows, so the diesel bay cannot block dispatch doors, truck lanes or emergency routes.
Salt air near the coast shortens the life of untreated metal around tanks, brackets and cabinets. Dry inland conditions put dust into vents and caps, and that means more attention on seals, filters, breathers and general cleanliness around the refuelling zone. Load shedding also changes when top-ups happen, especially on sites that cannot wait for normal delivery timing.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information to send for Diesel Bay
Send photos of the current tank area, the generator position and the vehicle access route. Note the litres on site, the usual refuelling method and any leaks, staining or blocked access around the bay.
Keep the tank record, delivery slips and runtime log together when fuel use is being checked. If there is an ATS panel on the installation, store that paperwork separately so diesel handling notes stay easy to follow during inspections and service visits.
What our Industrial Generator customers say
Verified Google reviews
