Specs
Ats Panel specs
Setup notes and briefing numbers for Ats Panel.
ATS panel ratings and changeover points
The ATS Panel specs page covers the details buyers usually need before matching a panel to an existing generator installation. Use it to check the practical specification points against the site layout, control requirements, and present changeover arrangement.
Start with the mains supply, generator output, and required changeover mode. ATS panel specs for South African industrial sites usually need breaker size, voltage, phase arrangement, enclosure type, and cable entry positions checked against the existing board. Coastal corrosion around Durban and dust on inland sites can change the enclosure and component choice.
Photos of the present incomer, generator breaker, and control wiring help when matching a replacement or new panel. Include the nameplate details and any fault codes seen during recent outages. That gives a clearer view of timer settings, sensing points, and whether the current changeover arrangement is suitable.
Panel details buyers usually check
Most buyers want the transfer type, amp rating, short circuit withstand, controller functions, and indication layout in one place. Mechanical interlocking, neutral handling, and manual bypass options also matter where production cannot stop for panel maintenance. On retrofit jobs, terminal space and gland plate access can be as important as the headline rating.
Check the ATS specification against the generator controller, site earthing method, and the present main switch before widening the scope. Your plant load, the ATS panel already fitted and the hours you run through an outage decide the genset size. The panel already fitted also shows whether it suits AMF duty, simple mains failure changeover, or a more specific control sequence.
- Amp rating matched to site load
- Timer settings for start and transfer
- Controller compatibility with existing genset
South African installation conditions
Many sites have older distribution boards, limited wall space, and mixed equipment from past upgrades. ATS panel specs should therefore record available fault level, cable route, and whether the plant uses top or bottom entry. Freight handling into Gauteng, Durban, or Cape Town also affects enclosure size and whether the panel can arrive fully built or needs sectional assembly.
Coastal locations often need better protection against corrosion on terminals, hinges, and gland plates. Inland factories may need extra attention to dust sealing and cooling space inside the enclosure. Regular load shedding makes test intervals, return-to-mains delay, and generator cool-down settings more important than they appear on a basic sheet.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information needed before matching
Send the supply voltage, load current, generator model, and the present changeover method. Add photos of labels, breakers, and controller screens if parts have been changed over time.
Keep the ATS panel record with the service file and runtime log for the same installation. When the buyer checks supporting documents later, those three records usually answer the main questions on compatibility, switching sequence, and operating limits.
What our Industrial Generator customers say
Verified Google reviews